PRODUCTION CASE STUDIES

GREENBELT MUSIC FESTIVAL 2010-2011 TECHNICAL MANAGEMENT

Mark technically managed this Festival of Music Worship Workshops Speech and Video elements. The Organisers were keen to extend the running times of Theatre Big Top later into the evening with music events and wanted the main stage to have less of an impact to the surrounding festival elements and camping areas. Mark was able to redesign the PA system and their installation and with some acoustic treatments in the main stage arena enabled both these wishes to be achieved alongside the more general technical management of other Sub Contractors and Service Providers.